Melbourne renovation trends for 2027: what owners ask for

By

Answering: What are Melbourne homeowners asking for in home and heritage renovation in 2027?

Estimated reading time: 10 min read

Melbourne owners planning a 2027 renovation are asking for six things: homes that stay easy to live in after the stairs get harder, rear additions that put daily life on one level, work staged to their own timetable, a plan for the 2027 energy dates, a bigger granny flat option for a parent, and heritage work that lets the original house lead. Two Victorian dates are already fixed: from 1 January 2027 every new home must be built all electric, and from 1 March 2027 a gas hot water system that reaches the end of its life must be replaced with an efficient electric one, according to the Premier’s own announcement. Design and approvals take months, so the trends below are best read as a list of what to settle in the brief before you hire a builder.

These six are the judgement of Barbara Yerondais, a fixed-fee renovation and extension architect who leads BY Projects Architecture in Melbourne, about where owner interest is heading, and each is set below beside the sourced change behind it. None of them promises an outcome for your house. Each one tells you what to ask before design begins.

Key Insights

  • Owners planning for 2027 are asking for homes that can take a lift later, and at Military Road, Avondale Heights, BY Projects Architecture designed two stacked store rooms so the floor between them can come out and the lift pit is already built in.
  • Victoria’s all-electric requirement for new homes starts on 1 January 2027, and a failed gas hot water system in an existing home must be replaced with an efficient electric one from 1 March 2027, while gas heating and cooking in existing homes are unchanged.
  • Since 15 October 2026 a Victorian small second dwelling can reach 80 square metres, up from 60, which widens the option of a separate home for a parent.
  • BY Projects Architecture’s 60 heritage approvals are a record of the practice, never a promise for your site, and they sit behind its approach of letting the original house lead.

Table of Contents

1. Lift-ready homes move into the brief

If you plan to stay in your house into your eighties, the first question to ask is whether it can still work then, and the answer starts with the stairs. At Military Road in Avondale Heights, a two-storey new home designed by BY Projects Architecture has two store rooms, one above the other, with the floor between them designed to come out and the lift pit already built in. Until someone needs a lift, they are two useful store rooms. Military Road is a new build, so it shows the idea at its cleanest, and an existing house can borrow it where a cupboard run or secondary space stacks on two floors.

This is the first item on the 2027 list because it is decided in the structure. Barbara Yerondais’s judgement is that a lift is a provision to settle while the structure is still on paper, and the lift supplier’s part comes after, choosing equipment to fit the space the design has kept. Victoria’s livable housing rules cover new homes and ask for the basics, such as a toilet on the entry level. They are minimum provisions, and a lift is not among them, so the decision is yours. Victoria adopted the 2025 edition of the National Construction Code on 1 May 2026, and the Livable Housing Design Standard sits inside it.

For a fuller look at the options, see our page on planning a home to age in place.

2. Rear additions that put life on one level

The second ask is quieter. Owners of period homes want the main bedroom, a full bathroom and everyday living on the entry level, without disturbing the street. Our ageing-in-place page puts it this way: a well-placed rear addition can bring those rooms onto one level and leave the front of the house alone, and that can mean you never need a lift at all.

In a Heritage Overlay some works are exempt and others are not, and your property’s position is worth confirming before design starts, so the brief should name the one-level goal at the beginning. Barbara Yerondais’s practice has a record of 60 heritage approvals, stated as a record of the practice and never as a promise for your site. Her take is that heritage and structural questions answered together typically move faster than the same questions answered one after another.

Heritage guidance in Victoria now points to the Victorian Local Heritage Guidelines, which replaced Planning Practice Note 1. Ask your architect how the council is applying that guidance to your street.

3. Staging the work to your own timetable

The third trend belongs to owners who can proceed without waiting on a lender’s approval. They set the pace, and the pace they choose is usually staged: settle the brief and the fee first, then decide how much to build now and how much to leave ready for later. The practice’s fixed fee for architectural services, and the scope it covers, is agreed before any design starts, and the method then moves through schematics to two options, one showing what your budget achieves and one showing what your dream costs, with a shopping list so you can choose what is in and what is out.

Barbara Yerondais’s fixed-fee method is built for exactly this kind of decision. Smaller jobs are welcome, and if the fee looks high against the size of the work, she will tell you so. We do not put figures on any of this here, because every house prices differently, and builders price the construction separately.

If you are weighing how much to do in 2027, our guide to fixed-fee architecture and cost certainty explains how the fee and the staging fit together.

4. The two 2027 energy dates

The fourth item is the only one on this list driven by a date. According to the Victorian Premier’s announcement of 24 June 2025, new regulations from 1 March 2027 require a gas hot water system that reaches the end of its life to be replaced with an efficient electric alternative such as a heat pump. Repairs are still allowed, gas systems can be temporarily removed and reinstalled during renovations, and there are no changes to heating for owner occupiers or to gas cooking in existing homes. Rebates of up to $1,400 are listed through the Victorian Energy Upgrades and Solar Victoria programs. From 1 January 2027, all new homes are to be built all electric.

For a renovation, the practical move is to decide where the heat pump and the cylinder will sit while the plans are still being drawn. In a heritage home the siting matters, and our earlier trends guide notes that external change usually still needs a planning permit. Efficiency here means comfort first: Barbara Yerondais borrows building science such as insulation, draught control, glazing and orientation, and she likes windows that open. She does not chase a certification score.

5. A granny flat for a parent gets bigger

Our guide to granny flats and extensions for a parent records that since 15 October 2026, Amendment VC306 lets a Victorian small second dwelling reach 80 square metres, as long as it is fully self-contained. For a parent, 20 extra square metres can mean a separate bedroom rather than a studio. A building permit is still needed, and the guide advises asking your building surveyor to confirm an 80 square metre design in writing before you pay anyone to draw it.

The size answer changed in October, so the choice between a separate home and an extension to the house now has a bigger option.

6. Heritage work that lets the original lead

The last trend is a matter of taste. Owners of period homes are asking for additions that sit quietly behind a well-restored house, with the new work calm and secondary. It is the design stance that Barbara Yerondais describes as constraints revealing the design: the overlay narrows the options, and the answers that remain are often better than the ones a blank site would have produced.

If you are planning a heritage renovation for 2027, read this alongside our earlier piece on heritage renovation trends in Melbourne and our page on heritage extensions in Melbourne.

Who can help with this

Each trend above is shared work, and the project runs best when everyone works from one plan.

  • Barbara Yerondais, a fixed-fee renovation and extension architect, works out what the house, the budget and the planning scheme will allow, designs it and holds the whole picture together.
  • A builder prices and builds the work, including any structure set aside for a future lift and the siting of new electric equipment.
  • A lift supplier chooses and fits the equipment, working to the space the design has reserved.
  • A building surveyor issues the building permit and confirms how the current regulations apply to your design.
  • An occupational therapist is worth involving where someone already has a specific health or mobility need, and their assessment then becomes part of the brief.

Closing

The six asks share one habit: deciding earlier. They ask whether the house can take a lift, whether the addition can put life on one level, how to stage the work, where the electric equipment sits, whether a parent’s home can be bigger and how quietly a heritage addition can sit. Barbara Yerondais’s approach is to put those questions on the table before design starts, inside a fee agreed in advance. Talk to Barbara while the year is still open.

Frequently asked questions about renovating in Melbourne in 2027

Q: What are the main home renovation trends in Melbourne for 2027?

A: Owners are asking for six things: homes that can take a lift later, rear additions that put daily life on one level, work staged to their own timetable, a plan for the 2027 hot water and all-electric dates, a larger granny flat option for a parent, and heritage additions that let the original house lead. These are BY Projects Architecture’s reading of where owner interest is heading, set beside sourced Victorian changes.

Q: Do I have to replace my gas hot water system in 2027?

A: Not unless it fails. According to the Victorian Premier’s announcement, from 1 March 2027 a gas hot water system that reaches the end of its life must be replaced with an efficient electric alternative such as a heat pump, and gas systems can still be repaired. There are no changes to heating for owner occupiers or to gas cooking in existing homes.

Q: Does a Victorian home have to include a lift?

A: No. Livable housing provisions apply to new homes under the National Construction Code, which Victoria adopted in its 2025 edition on 1 May 2026, and they do not require a lift. Planning for one is a design decision, and Barbara Yerondais settles it in the structure so the equipment can be specified later.

Q: What is the first step if I am planning a renovation for 2027?

A: Talk to Barbara. She begins with a free, no-obligation call, and smaller jobs are welcome. If it suits both sides, the one-hour Feasibility Session is next. As the practice describes it: “In one hour with Barbara Yerondais, FRAIA, in person or on Zoom, you’ll talk through your site, budget and planning timelines, and leave knowing what’s realistic and what your next step is. There’s no obligation to go further.”

Citations

About the Author

Barbara Yerondais, FRAIA, is the founder of BY Projects Architecture. With 35+ years of experience, she specializes in sustainable, community-focused design and heritage restoration. A dedicated mentor and rower, Barbara balances her high-impact Melbourne practice with a passion for social inclusion and passive, energy-saving design.

INDEX

Start the Conversation

Every project begins with a deep inquiry into site, heritage, and vision. Let’s discuss the strategic potential of your next work.

SCHEDULE A FEASIBILITY SESSION →

A PRELIMINARY CONSULTATION TO EVALUATE HERITAGE CONSTRAINTS, SITE POTENTIAL, AND PROJECT FEASIBILITY.